Restoration Job File Checklist: Water, Mold and Fire (Template)
The water-specific version is in the mitigation documentation checklist. This is the master list for every job type.
CHECKLIST: Master job file (TEMPLATE, adapt to your company)
Intake
- Caller, address, callback number, time of call, who answered
- Loss type, date of loss, insurer (if given), year built
- What the caller was told and when you promised to arrive
Authorization
- Signed work authorization by someone with authority
- Itemized good-faith estimate for insurance-related work (s. 489.147(2)(e))
- Mold jobs: contract "in a document or electronic record, signed or otherwise authenticated by the parties" (s. 468.8422)
- Required notices for your contract type (for example lien-law notice; roof-contract notices)
Site record
- Photos and video: before, during, after; every room; close-ups with a scale
- Hazards noted: electrical, structural, sewage, suspected asbestos, pre-1978 paint
- Water: category/class reasoning, moisture map, daily readings, equipment logs
- Mold: area measurements, containment photos, who assessed (independent assessor)
- Fire: affected areas, contents inventory if handled, odor treatment used
Compliance records
- Pre-1978 homes: RRP cleaning verification and records, which are required even for emergency renovations (40 CFR 745.82(b))
- Respirator users on the job: medical clearance and fit test current
- Subcontractors: certificate of insurance / workers' comp on file
Changes and close-out
- Signed change orders
- Completion sign-off
- Copies to the owner (Florida's claims bill of rights tells owners to document repairs and keep receipts: s. 627.7142)
- Final furnishing date recorded (lien deadlines run from it)
- Invoice reviewed line by line against the file
Why one checklist matters
IICRC's S500 standard lists "Administrative procedures, project documentation, and risk management" among its components (IICRC). The best way to prove you followed a standard is a file that shows each step, the same way, on every job.
Questions owners ask
Paper or software?
Either, as long as it's complete, timestamped and retrievable. What matters is that the same items get captured on every job.
Who should check the file?
Someone other than the tech who did the job, before the invoice goes out.
Sources
- Florida Statutes s. 468.8422, Contracts (mold) (checked Invalid Date)
- eCFR: 40 CFR 745.82, Applicability (RRP) (checked Invalid Date)
- Florida Statutes s. 627.7142, Homeowner Claims Bill of Rights (checked Invalid Date)
- IICRC: ANSI/IICRC S500 (checked Invalid Date)
- Florida Statutes s. 489.147, Prohibited property insurance practices (checked Invalid Date)
See a mistake or an outdated number? Tell us and we'll re-check it against the source. Read our editorial policy.
Keep reading
Water Mitigation Documentation Checklist: What to Capture So Invoices Hold Up
A job-file checklist for water mitigation: authorizations, photos, moisture maps, daily readings, equipment logs and change orders, built on Florida law and S500.
Lead Paint and Water Damage Jobs: How EPA's RRP Rule Applies to Restoration in Pre-1978 Homes
EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint in pre-1978 housing. What the emergency renovation exemption does and doesn't excuse.
Respirators on Restoration Jobs: OSHA's Program, Medical Evaluation and Fit Testing Rules
If your crews need respirators for mold, sewage or fire jobs, OSHA requires a written respiratory protection program, medical evaluations and annual fit tests.
Drying Equipment ROI: Utilization, Payback and When to Buy vs. Rent
How to judge whether dehumidifiers, air movers and air scrubbers pay for themselves, using your own utilization and billing numbers, plus a free calculator.
Florida Construction Lien Basics for Restoration Companies: Deadlines That Protect Your Invoice
The Florida lien-law deadlines restoration owners should calendar: the 713.015 contract notice, 90 days to record, 15 days to serve, and 1 year to sue.
How Restoration Pricing Works: Estimates, Price Lists, Insurance Caps and Florida Rules
How water, mold and fire jobs get priced: itemized estimates, regional price lists, insurer caps like Citizens' $3,000, deposits and post-storm pricing rules.